before my VA trip, complete with the trenches dug and the plumbing roughed in.

before my VA trip, complete with the trenches dug and the plumbing roughed in.

Prior to leaving for a trip to Charlottesville, you can see the exposed heart pine (which we will reclaim) along with trenches and framing that went up. In addition to roughing out the plumbing, they were also able to go a bit further on pouring footers and installing the vapor barrier:

IMG_2788

 

While away, they demoed the existing kitchen to reveal these beautiful slats of wood (type not yet known) that we’ll also reclaim (photo by Mary Quinn Templeton):

IMG_3133

Some of the heart pine won’t be able to be reclaimed due to elemental damage and termite nibblings:

IMG_2652 IMG_2653 (1)

 

All in all, things are cooking along at Cannon House. Poor Triscuit is in for a big surprise when we get home—her lair will be in major disarray.

Upon my return I’ll post a before and after that shows the progress. We should be in to framing the addition next week. — WP

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.